Skip to content
CPCole's Pro PaintingHouse painters, Tacoma and Pierce County Line open 24/7(253) 478-2745
Commercial & Property painting, Tacoma

Apartment and HOA painting in Tacoma, phased building by building

Multifamily painting is a different job from a single house.

  • 24/7Phone answered
  • $2,960-$6,840Typical, per unit stack (exterior)
  • 66Areas we paint
Three-story garden apartment building freshly painted in muted sage with white trim and dark railings in Lakewood, wet parking lot under gray clouds
Quick answer

Apartment and HOA painting in Tacoma covers exterior repaints of apartment buildings, condos and townhome communities, plus common-area interiors like halls and stairwells. We wash, repair, caulk and repaint in phases while residents stay home. Typical exterior work runs $2,960-$6,840 per building unit stack after a walk-through, depending on siding, height, repairs and the color plan approved by the board.

Multifamily painting is a different job from a single house. A condo community in University Place or a garden-style apartment complex in Lakewood may have a dozen buildings, hundreds of windows and residents coming and going all day. The paint work has to fit around parking, balconies, pets and work schedules, and the board or property manager needs clear updates the whole way through.

We plan these projects building by building. Each phase starts with a soft wash, then repairs, caulking and paint, followed by a walk with the manager before we move on. Residents get notices ahead of time about balcony clearing, window closures and parking. For single-unit refreshes between tenants, our rental turnover painting service is the better fit. Call (253) 478-2745 to set up a property walk.

When to call

Signs it is time for apartment & hoa painting

Faded or chalky siding

When siding leaves powder on a hand, the coating has broken down and water will start reaching the substrate soon.

Peeling trim and fascia

Flaking paint on trim, fascia and window casings lets rain into the wood, and rot spreads quickly in our wet season.

Mildew on north faces

Green and black growth on shaded walls makes a community look neglected and breaks down the paint film faster.

Mismatched touch-up patches

Years of spot repairs in slightly different colors make buildings look patchy and lower curb appeal for buyers and renters.

Reserve study calls for repaint

When an HOA reserve study shows the paint cycle is due, planning early keeps costs and timing under control.

Worn hallways and stairwells

Common-area walls, railings and doors take heavy traffic and show scuffs, dents and fingerprints fast.

How do you repaint an apartment complex while residents live there?

Communication matters as much as the painting. Before work starts on a building, residents get written notices with dates, what to move off balconies and patios, when windows must stay closed, and where to park. We post updates on doors or in common areas and keep the manager informed each day. Residents with health concerns or pets that need special handling can be flagged ahead of time, and we schedule around those units where possible.

On site, we work one building or one side at a time so the disruption stays small. Ladders and lifts are moved at the end of each day, and walkways stay clear. We keep spray work away from parked cars, cover entries and use brushes and rollers near doors and patios. If a resident has a question, they can call us any hour at (253) 478-2745. A calm, predictable job keeps complaints low for the board and the management team.

What should an HOA board plan for before a repaint?

The most important step is setting the scope early. A good repaint usually includes washing, wood repair, caulking and paint, but the amount of repair is often the biggest unknown. We walk every building and note rotted trim, failing caulk and damaged siding so the board can budget for it. Many Tacoma-area communities built in the 1980s and 1990s have T1-11 or hardboard siding that needs extra attention at the bottom edges and around windows.

Color selection is the next piece. Boards often want to update a dated palette, but changes need approval and sometimes a community vote. We can put up large sample areas on one building so owners can see the colors in real light before voting. Scheduling is the last part, since the exterior painting season runs mainly from late May to mid September. Boards that approve the scope in winter usually get the best start dates for the coming summer.

Which siding and trim problems show up most on Tacoma multifamily buildings?

Many complexes around Lakewood, Federal Way and Puyallup use T1-11 plywood or hardboard siding, which soaks up water at the cut bottom edges and swells or delaminates. Before painting, we replace soft panels and seal the edges. Fiber cement siding on newer buildings holds paint well but needs good caulk at butt joints and trim. Stair stringers, balcony rails and deck edges also take a beating, since water sits on flat surfaces for months at a time.

Trim and fascia are the other common failure point. Gutters that overflow, missing kick-out flashing and old caulk all let water into wood trim. We repair what we can as part of the paint job and flag anything structural or roof-related for the board. For larger repair lists, our wood rot repair work can be scoped separately, and caulking and sealing is built into each phase to keep water out between paint cycles.

Empty rental apartment with freshly painted white walls and clean floors ready for move in
Prep sets the finish: most of a paint day goes into the work before color goes on.
What is included

What our apartment & hoa painting covers

  • Property walk with the manager or board to set scope and phases
  • Written resident notices covering dates, balconies, windows and parking
  • Soft washing of siding, trim and walkways to remove mildew and dirt
  • Wood rot repair on trim, fascia and siding boards before painting
  • Caulking of joints, windows and penetrations to keep water out
  • Exterior paint on siding, trim, doors, railings and stair stringers
  • Common-area interior painting of halls, stairwells and lobbies
  • Building-by-building walk-throughs with sign-off before moving on
Job days

How a apartment & hoa painting job runs

Typical order of work on a Tacoma-area project. Weather can shift exterior days.

  1. D1

    Walk the property

    We walk each building with the manager or board and note repairs, siding types and access. You get a written scope and a phase plan.

  2. D2

    Set colors and notices

    We help test colors on site if the palette is changing. Resident notices go out ahead of each phase with clear dates and instructions.

  3. D3

    Wash and repair

    Each building is soft washed and left to dry. Rotted trim and siding are replaced, and old caulk is cut out and redone.

  4. D4

    Prime and paint

    Bare wood and repairs get primer, then siding, trim, doors and railings are painted. We work one side at a time to limit disruption.

  5. D5

    Walk each building

    Before moving on, we walk the finished building with the manager and fix any punch-list items. Sign-off keeps the job on track.

  6. D6

    Close out the project

    At the end we provide a color schedule and leftover paint for touch-ups. You have a record for the next reserve study.

Cost

What moves the price of apartment & hoa painting

Typical range $2,960-$6,840 per unit stack (exterior). These are the things that push a job toward either end.

  1. Siding type, such as T1-11, hardboard, fiber cement or vinyl.
  2. The amount of wood rot repair on trim, fascia and siding panels.
  3. Building height and access, including lifts on three-story walls.
  4. Number of balconies, stairways, railings and doors per building.
  5. Color changes that need extra coats or primer over dark colors.
  6. Common-area interior work like halls, stairwells and lobbies.
Local

Apartment & HOA Painting around Tacoma and Pierce County

The Tacoma area has a wide mix of multifamily housing. Lakewood and Federal Way have large garden-style complexes from the 1970s through the 1990s, many with T1-11 or hardboard siding that needs repair before paint. University Place and Gig Harbor have condo and townhome communities with HOA boards and reserve studies. Downtown Tacoma and the Hilltop have newer mixed-use buildings and older brick apartments. Because exterior multifamily repaints are big projects, most run from late May through mid September, and boards that set their scope over the winter tend to get the best start dates for the dry season.

Where we do the most apartment & hoa painting

Storefront on a Tacoma business street with new paint on the facade and trim under a gray sky
FAQ

Apartment & HOA Painting questions from Tacoma homeowners

Do residents need to move out during an apartment repaint?

No. Residents stay in their homes the whole time. We ask them to clear balconies and patios before their building is painted, keep windows closed on certain days, and move cars if we are working near parking. Notices go out ahead of time with dates. Most residents barely notice the work after the first day, since each building is done in a few days.

Can you present a color plan to our HOA board?

Yes. We can prepare a short presentation with two or three palettes, then paint large sample areas on a building so owners can see them in real light. That makes votes easier and avoids surprises. Once a palette is chosen, we write a color schedule for every surface. Our color consultation service can support the board through the whole process.

How long does it take to repaint a condo community?

It depends on the number of buildings and the amount of repair. A small community of a few buildings may take a few weeks, while larger complexes can take most of a summer. We give you a building-by-building schedule after the walk-through. Weather can shift dates, since paint needs dry days, but phasing keeps the work steady and predictable.

Do you handle common-area interior painting too?

Yes. We paint hallways, stairwells, lobbies, laundry rooms and other shared spaces with durable, scrubbable finishes. Those spaces see heavy traffic, so we often recommend satin or eggshell on walls and semi-gloss on doors and railings. Interior work can be scheduled year-round, which makes it a good winter project while exterior work waits for summer.

How do you handle rot repair on multifamily buildings?

We note rot during the property walk and give the board an estimate of how much repair to expect. During the work, we replace soft trim, fascia and siding panels as we find them and keep a log by building. If we uncover more than expected, we stop and share photos with the manager before going further, so there are no surprise costs at the end.

Talk to us about apartment & hoa painting

Call and tell us what you are painting. We answer 24/7 and set up a walk-through at a time that suits you.

Answered 24/7(253) 478-2745